Extron-electronics PoleVault Systems PVS 200, 300, and 400 Manual de usuario Pagina 1

Busca en linea o descarga Manual de usuario para Hardware Extron-electronics PoleVault Systems PVS 200, 300, and 400. Extron Electronics PoleVault Systems PVS 200, 300, and 400 User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 50
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
PoleVault Systems
Installation Guide for the PVS 200, 300, and 400
68-1390-01
Rev. D
03 09
Vista de pagina 0
1 2 3 4 5 6 ... 49 50

Indice de contenidos

Pagina 1 - PoleVault Systems

PoleVault SystemsInstallation Guide for the PVS 200, 300, and 40068-1390-01 Rev. D03 09

Pagina 2 - Precautions

Introduction — Inventory Overview, cont’d1-8PoleVault Systems Installation • Introduction — Inventory Overview1-8N If any items in the PoleVault Syst

Pagina 3 - Introduction

1-9PoleVault Systems Installation • Introduction — Inventory Overview 1-9 b. Items not includedThe following items are not included. However, input

Pagina 4 - Introduction, cont'd

PoleVault Systems Installation • Introduction — Inventory Overview1-10Introduction — Inventory Overview, cont’dd. Installation toolsTo aid the profes

Pagina 5 - 1. Room layout

2-1PoleVault Systems Installation • Installation Overview Installation OverviewInstallation OverviewThis overview outlines the basic steps for install

Pagina 6 - Walking Parallel to a Wall

PoleVault Systems Installation • Installation — Stage 12-2Stage One — Install the Screen and ProjectorStage 1 This stage involves installing the thre

Pagina 7 - Each speaker covers

2-3PoleVault Systems Installation • Installation — Stage 1 1. Mark screen locationa. Mark the center line and the outer edges of screen.T When marki

Pagina 8 - 2. Inventory

PoleVault Systems Installation • Installation — Stage 12-4Installation — Stage One, cont’de. Using suitable screws, mount the projector onto the low

Pagina 9 - PVT RGB D

2-5PoleVault Systems Installation • Installation — Stage 1 4. Cut the ceiling tilea. Mark the location of the PCM 240 on the T-bar, before removing i

Pagina 10 - — Inventory Overview, cont’d

PoleVault Systems Installation • Installation — Stage 12-6Installation — Stage One, cont’d6. Secure the Projector Ceiling Mount to the ceilinga. Att

Pagina 11

2-7PoleVault Systems Installation • Installation — Stage 1 T Install any optional power outlets in the 2 gang opening on the mounting plate, towards

Pagina 12

This symbol is intended to alert the user of important operating and maintenance (servicing) instructions in the literature provided with the equipmen

Pagina 13

PoleVault Systems Installation • Installation — Stage 22-8Stage Two — Install the Wall Plates and MLC 104 IP Stage 2This stage involves installing the

Pagina 14 - (Top Section)

2-9PoleVault Systems Installation • Installation — Stage 2 PVT transmitter installation • CAT 5 568A signal transmission cables (connects PVT’

Pagina 15 - 1. Mark screen location

PoleVault Systems Installation • Installation — Stage 22-10Stage Two — Install the Wallplates and MLC 104 IP PlusN The installation must conform to n

Pagina 16 - 3. Verify the image location

2-11PoleVault Systems Installation • Installation — Stage 2 2. Pull cablesThe following cables need to be installed: • CAT 5 cables for signal trans

Pagina 17 - 4. Cut the ceiling tile

PoleVault Systems Installation • Installation — Stage 22-12Installation — Stage Two, cont’d3. Install wall platesa. Connect the CAT 5 cables to the r

Pagina 18

2-13PoleVault Systems Installation • Installation — Stage 2 4. Install MediaLink ControllerT Before cabling and installing the MLC 104 IP Plus, locat

Pagina 19 - 7. Install the Screen

PoleVault Systems Installation • Installation — Stage 22-14Installation — Stage Two, cont’db. Connect the IR/RS-232 projector communication cable as

Pagina 20 - Rear View

2-15PoleVault Systems Installation • Installation — Stage 2 ExtronMLC 104 IP PlusRotate locking armand insert into wallopening.OFFONOFFONExtronCONFIGD

Pagina 21 - CAT 5 Patch, 50'

PoleVault Systems Installation • Installation — Stage 32-16Stage Three — Install the PV SI 3C LP Ceiling SpeakersStage 3This stage involves installing

Pagina 22 - 1. Install mud rings

2-17PoleVault Systems Installation • Installation — Stage 3 N The installation must conform to national and local electrical codes, and UL requirem

Pagina 23 - 2. Pull cables

1-1PoleVault Systems Installation • IntroductionIntroductionOverviewThis manual covers the installation of the Extron PoleVault™ System in a drop ceil

Pagina 24 - RGB IN # 1

PoleVault Systems Installation • Installation — Stage 32-18Installation — Stage Three, cont’de. Loosen the four screws on the front baffle (counter cl

Pagina 25 - Drain Wire

2-19PoleVault Systems Installation • Installation — Stage 3 c. To terminate the cable, strip the end of the cable 0.2" (5 mm) and secure the wi

Pagina 26 - IR connection

PoleVault Systems Installation • Installation — Stage 32-20Installation — Stage Three, cont’d5. Finish speaker installationa. Install/replace the spe

Pagina 27 - Projector

2-21PoleVault Systems Installation • Installation — Stage 4 Stage 4This stage covers installing the devices shown below.LRAUX/MIX IN1B1AINPUTSOUTPUTS2

Pagina 28 - SPK 18, 25'

PoleVault Systems Installation • Installation — Stage 42-22Installation — Stage Four, cont’dN The installation must conform to national and local e

Pagina 29 - 1. Cut ceiling tile

2-23PoleVault Systems Installation • Installation — Stage 4 3. Install the PVS 204SA switchera. Pass two 4-40 x 3/16" screws up through the PMK’

Pagina 30 - 4. Cable the speakers

PoleVault Systems Installation • Installation — Stage 42-24Installation — Stage Four, cont’dL RAUX/MIX IN1B1AINPUTSOUTPUTS2B2A43RS-232 MLC/IRDC VOL4/

Pagina 31 - 8 Ohm Load

2-25PoleVault Systems Installation • Installation — Stage 4 FRONTREARRear Plate4c Attach and screw down rear plate4d Replace projector on the adjuster

Pagina 32 - Apply 4 pieces of black putty

PoleVault Systems Installation • Installation — Stage 52-26Stage Five — Congure the SystemStage 5Items needed to help complete this stage:• Laptop (

Pagina 33 - V RCA, 3'

2-27PoleVault Systems Installation • Installation — Stage 5 1d Select MLC 104 IP Plus/PoleVault System from the drop down boxd. Select the MLC 104

Pagina 34 - 1. Pull the cables

PoleVault Systems Installation • Introduction1-2Introduction, cont'dLRAUX/MIX INDO NOT GROUNDOR SHORTSPEAKER OUTPUTS!1B1AINPUTSOUTPUTS2B2A3B3ARS-

Pagina 35 - PVS 204SA

PoleVault Systems Installation • Installation — Stage 52-28Installation — Stage Five, cont’d2c Check that an image is present, adjust as neede

Pagina 36 - Receive (Rx)

2-29PoleVault Systems Installation • Installation — Stage 5 2e Set MLC volume to maximum, and adjust the level on the switcher FRONTREARFrontPlateC

Pagina 37 - Rear Plate

PoleVault Systems Installation • Optional Accessory Installation2-30Optional Accessory Installation — PPC 25The Priority Page Controller (PPC 25) mome

Pagina 38 - 1. Congure the system

2-31PoleVault Systems Installation • Optional Accessory Installation POWERCNOPAGINGSENSOROUTTIMERELAYSENSITIVITY12V0.5AMAXON12LRRS-232 MLC/IR4/8OhmsAM

Pagina 39

PoleVault Systems Installation • Optional Accessory Installation2-32Optional Accessory Installation — PPC 25POWERC NOPAGING RELAYDELAYSENSITIVITY12V0.

Pagina 40 - 2. Test the system

2-33PoleVault Systems Installation • Optional Accessory Installation Testing and Adjustment ProcedureThe fully installed system is shown below To tes

Pagina 41 - 3. Final installation

PoleVault Systems Installation • Reference Information2-34Reference InformationSpecicationsFor detailed specications and warranty information of the

Pagina 42

2-35PoleVault Systems Installation • Reference Information DevicesPVS 204SAExternal power supply ... 100 VAC to 240 VAC, 50/60 Hz, exte

Pagina 43

PoleVault Systems Installation • Reference Information2-36Installation — Reference Information, cont’dCeiling mount installation diagram (with item we

Pagina 45 - Sensitivity knob adjustment

1-3PoleVault Systems Installation • Introduction — Planning Before you Begin Installation - PlanningBefore installation is started, you must consider

Pagina 46 - Reference Information

Extron USA - West Headquarters+800.633.9876Inside USA / Canada Only+1.714.491.1500+1.714.491.1517 FAXExtron USA - East+800.633.9876Inside USA / Canada

Pagina 47 - PVT CV D and PVT RGB D

PoleVault Systems Installation • Introduction — Planning1-4Introduction — Planning, cont’d• Lighting  Type and control (important for projector ima

Pagina 48 - VIDEO RGB

1-5PoleVault Systems Installation • Introduction — Planning • Viewing obstructions  Pillars, furniture etc., window locations for glare reduction,

Pagina 49

PoleVault Systems Installation • Introduction — Inventory Overview1-6Introduction — Inventory Overview2. Inventorya. Included itemsThe PoleVault Sys

Pagina 50 - Outline of installation steps

1-7PoleVault Systems Installation • Introduction — Inventory Overview PVT CV DWallplatePVT CV D White60-819-13(1) Mud ring (2) Dog legs(2) Dog leg scr

Comentarios a estos manuales

Sin comentarios