Extron-electronics MLC 226 IP Series Installation Manual de usuario Pagina 43

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 164
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 42
3-13
MLC 226 IP Series • Operation
PRELIMINARY
10. Click Add Schedule. The Scheduled Actions Wizard window reappears.
11. Type in a name for the schedule that will automatically unlock the MLC’s
panel.
12. In the Schedule Times area, select the days and hours when the front panel
should be unlocked.
13. Click Next.
14. Set up the front panel unlock action for the MLC.
a. Check the Action check box.
b. Select the MLC, itself, from the Subject Ports list.
c. Click on Unlock Front Panel in the Available Options list. If desired, you
can change the name assigned to this action in the Action Name area.
d. Click Apply Action.
e. Click Done. The Scheduled Actions Wizard window closes.
15. Save the project: click File and then Save or click the Save icon.
16. Upload the project to the MLC.
a. Click the Build menu and select one of the options (Build Changed
Configurations or Build All Configurations).
b. Click the Begin button.
c. When the uploading is fi nished, click Close.
Vista de pagina 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 163 164

Comentarios a estos manuales

Sin comentarios